{
  "id": "api:x402-46249bbdb65609fc",
  "kind": "api",
  "name": "api.brazilayer.com/v1/cadeias/energia_br",
  "description": "Causal chain for Brazilian power risk: forecast rainfall over the Southeast/South (leads reservoir levels by ~2-4 weeks) → stored hydro energy per subsystem and its 7-day slope, from the grid operator → likelihood of thermal dispatch and cost pressure. Brazil runs on hydro: this is the upstream of industrial energy cost, and the rule and its limits travel in the response. Free sample, no payment: https://api.brazilayer.com/v1/cadeias/amostra",
  "category": "x402",
  "url": "https://api.brazilayer.com/v1/cadeias/energia_br",
  "price": null,
  "x402": true,
  "meta": {
    "network": "eip155:8453",
    "scheme": "exact",
    "pay_to": "0x3Cc1D8ee1dfdFd326c19B0884B8dF4b24B623f0c",
    "method": "GET",
    "last_updated": "2026-11-11T11:30:44.993Z"
  },
  "trust": {
    "verified": true,
    "uptime_pct": 100,
    "latency_ms": 678,
    "checks": 1
  }
}